SINGAPORE – Two exits on the CTE towards the city will be closed during the early hours of four days in July, as there will be bridge launching works for the new pedestrian and cycling link across the PIE.
The closures will take place from July 28 to 31, from midnight to 5am, said the Urban Redevelopment Authority (URA) in a statement on July 22.
The city-bound CTE Exit 8A to PIE in the direction of Tuas will be closed.
Motorists who need to use the exit to get to the PIE should instead use CTE Exit 7C and enter the PIE via Moulmein Road and Thomson Road.
The city-bound CTE Exit 8A towards PIE in the direction of Tuas will be closed during early hours from July 28 to 31.
PHOTO: URBAN REDEVELOPMENT AUTHORITY
In addition, the city-bound CTE Exit 8B towards Upper Serangoon Road will also be closed.
Those who need to get to Upper Serangoon Road should instead use CTE Exit 10 towards Braddell Road.
The city-bound CTE Exit 8B towards Upper Serangoon Road will be closed during early hours from July 28 to 31.
PHOTO: URBAN REDEVELOPMENT AUTHORITY
The URA said that barricades and traffic diversion signs will be put up to guide motorists.
Motorists are also advised to plan routes in advance, drive carefully and follow the directional signs.
The new pedestrian and cycling link aims to boost connectivity between Potong Pasir and Bendemeer as part of the Bishan-to-City Links project.
The PIE bridge – nearly 700m in length – is now more than halfway complete, but parts of the highway will be closed on several nights for works to continue.
When the bridge is completed in the second half of 2027, cyclists can get from Bishan to the city centre in under 30 minutes.